## German Order of Battle

Start in any German area (maximum of five units per area): [No more than three armor units per area]

Battalion HQ: 10th Rec Hzr. KG — 2-7-5 (x1)

Battalion HQ Company: PSW 234/1 — 3-4-10 (x1); PSW 231 — 3-3-10 (x1); PSW 233 — 6-3-10 (x1)

Armor Car Company: PSW 234/1 — 3-4-10 (x1); PSW 231 — 3-3-10 (x1)

Armored Reconnaissance Company: AR/1, AR/2, AR/3 (10th Rec) — 4-6-6 (x3); AR Co. HQ (10th Rec) — 2-7-6 (x1)

Remnants (–) 9th SS Armor Car Company: 9th Recon PSW 231 — 3-3-10 (x1)

Light Armored Reconnaissance Company: LR/4, LR/5, LR/6 (10th Rec) — 4-6-6 (x3); LR Co. HQ (10th Rec) — 2-7-6 (x1)

Heavy Weapons Company: Hv Wp (10th Rec) — 5-7-6 (x3); Hv Wp SPW 250/8 (10th Rec) — 6-2-8 (x2)

Off-board as per Artillery Rules:

Artillery Support: Heavy Weapons Company (10th Rec) — 8(6) (x1)

Artillery Support: Arnhem Garrison Units — 6(4) (x1)

Artillery Support: Harzer Kampfgruppe (Hzr. KG) — 9(7) (x1); 8(6) (x1)

Start in Perimeter Zones A and/or B:

Battalion HQ: Hzr. KG (Bohlt) — 2-6-4 (x1)

1st Company: 1/1, 1/2, 1/3 (Bohlt) — 3-5-5 (x3); 1st Co. HQ (Bohlt) — 2-6-5 (x1)

2nd Company: 2/4, 2/5, 2/6 (Bohlt) — 3-5-5 (x3); 2nd Co. HQ (Bohlt) — 2-6-5 (x1)

Elements (—) Supply Company: PzKw III (Bohlt) — 4-5-8 (x3)

3rd Company: 3/7, 3/8, 3/9 (Bohlt) — 3-5-5 (x3); 3rd Co. HQ (Bohlt) — 2-6-5 (x1)

Reinforcements; Place in Zone C at start of turn 5:

Elements (–), 506th Tank Battalion: PzKw VIE — 6-7-7 (x2)

## British Order of Battle

Start in British areas containing matching setup colors (maximum of ten units per area): [Must place at least three units in each Victory Point Area]

(Yellow dot) 1st Parachute Squadron, Royal Engineers — 5-8-5 (x4)

(Green dot) Company C, 3rd Parachute Battalion: C/7, C/8, C/9 — 4-7-5 (x3 each)

(Red dot) Company A, 2nd Parachute Battalion: A/1, A/2, A/3 — 4-7-5 (x3 each)

(Black dot) Company B (-), 3rd Parachute Battalion: B/4, B/5 — 4-7-5 (x3 each)

(Blue dot) Elements 1st Reconnaissance Squadron: Tp. A, Tp. B — 3-7-5 (x3, x2)

(Blue dot) Elements 9th Field Company, Royal Engineers — 5-8-5 (x2)

Start in any British area(s):

93rd Company, Royal Army Service Corps — 3-6-5 (x3)

Defense Platoon — 4-7-5 (x3)

16th Parachute Field Ambulance — 3-6-5 (x1)

1st Air-Landing Anti-Tank Battery, Royal Artillery — 6-X-1 (x2)

A Co. HQ, 2 Para — 2-8-5 (x1)

B Co. HQ, 2 Para — 2-8-5 (x1)

C Co. HQ, 3 Para — 2-8-5 (x1)

2 Para HQ, 1 Bde — 2-8-4 (x1)

1 Recon HQ, 1 Div — 2-8-4 (x1)

1 Bde HQ, 1 Div — 2-8-4 (x1)

Off-Board as per Artillery Rules:

1st Light Regiment, Royal Artillery — 7(5) (x1)

## Historical Notes

With the breakout from Normandy and the advance across France and Belgium behind them, the British 21st Army Group reached the Dutch border in the summer of 1944 with high hopes of ending the war by Christmas. To carry out what he felt would be the decisive stroke, Field Marshal Montgomery devised an ambitious plan to cross the Rhine at the Dutch town of Arnhem, drive southwards through the industrial area of the Ruhr and finally into Berlin for the coup de grace. Codenamed Market-Garden, the operation required that three airborne divisions, the U.S. 82nd and 101st, and the British 1st, be dropped in an attempt to seize five major bridges along a sixty-mile section of road until eventually relieved by ground elements of the British XXX Corps.

Although every bridge in the airborne corridor was important, the principal objective of the operation was the final arched road bridge at Arnhem. Two secondary bridges located on the outskirts of Arnhem to the west were also of importance, especially if the road bridge could not be secured. One was a railway bridge and the other a floating ship bridge. The capture of all three bridges, and particularly the massive road bridge, was assigned to the British 1st Airborne Division.

On Sunday, September 17th the airborne drop began with the first British troops landing virtually unopposed. Because of the rather large distances from their landing zones and their objectives, the 1st Airborne&#x27;s reconnaissance squadron was organized to race to the main bridge in armored jeeps in hopes of seizing it by surprise. Engineers from the 9th Field Company were also to accompany the squadron in order to remove any demolition charges that might exist on the bridge. Upon landing, however, it was discovered that most of the gliders carrying the jeeps had failed to make the landing zones. It then became the responsibility of the 1st Parachute&#x27;s 2nd Battalion, commanded by Lt. Col. John Frost to move out for the road bridge first, closely followed by the 3rd and 1st Battalions each proceeding along a parallel but somewhat different route.

As Frost&#x27;s battalion advanced along the main road toward the outskirts of Arnhem, they reached the turnoff for the railway bridge. Although not the battalion&#x27;s primary objective, it was nevertheless very desirable to gain possession of this crossing of the Lower Rhine intact. Frost dispatched C Company to secure the railway bridge while he pressed on with the remainder of the battalion. In addition to occupying the bridge, elements of C Company were to be sent along the south bank of the river to the road bridge and assist the remainder of the 2nd Battalion in capturing the primary objective. As C Company approached, however, a large explosion shook the bridge and the southern span collapsed into the Rhine. With little choice left, the company retraced their steps and moved on to their next assignment, the capture of the German commandant&#x27;s headquarters in Arnhem.

Shortly after C Company had turned off for the railroad bridge the remainder of Frost&#x27;s battalion came under its first heavy fire. The majority of this fire came from Germans emplaced near the high ground called Den Brink. Units occupying this position could dominate the western approaches to the town. Fully realizing this, Frost ordered B Company to neutralize the Germans occupying the heights and follow up with their main task of capturing the floating ship bridge located between the railway and road bridges. This bridge, though undamaged, was later found to have had its center section removed and towed to a dock east of Arnhem.

Meanwhile, Frost continued his march to the road bridge, keeping close to the river with A Company in the lead. It was about 2000 hours on the 17th when the first platoons of A Company reached the northern approaches to the bridge. They quickly took up positions under the large concrete roadway piers. Within a few minutes, Captain Mackay of the Royal Engineers had also reached the northern approaches by another route. His men were ordered to take up positions in the buildings on the east side of the road embankment. One of the buildings occupied was the Van Limburg Stirumschool (building #1 on the German setup map on page 16), located furthest south on the embankment. From here one would have a commanding view of the approach ramp, as well as the eastern approaches to the bridge. After moving to occupy additional buildings on the embankment, the engineers soon discovered that one of the buildings housed a German Headquarters (building #2). Heavy fighting soon erupted, which resulted in a deadly hand-to-hand contest throughout the remainder of the evening. The engineers were finally able to successfully rout the Germans from their position while suffering only light casualties.

By this time Frost and his headquarters personnel had also shown up at the bridge and were taking up a position on the west side of the road embankment at the corner of Oranjewachstraat (building #3). Looking out from his position at the north end of the bridge, Frost was amazed at the lack of enemy reaction, but only half of the prize was his. The southern end of the massive bridge had still to be occupied. Assuming that B Company must have by now cleared the enemy opposition at Den Brink and be at the floating ship bridge, Frost tried to radio orders instructing them to attack the south end of the road bridge. As during much of the operation, however, Frost found his radio communications with both B and C Companies failing. Patrols were therefore sent out to determine their locations and obtain B Company&#x27;s assistance in storming the bridge. By this time, Major Gough and elements of his 1st Reconnaissance Squadron had also arrived at the bridge (building #6) having been delayed en route by a German ambush. By 2045 hours Frost decided not to wait any further and ordered a platoon from A Company to move onto the bridge and capture the southern end. The attack was quickly repulsed by automatic fire from a pillbox and armored car located on the bridge. Frost ordered a second attempt at crossing the bridge this time aided by engineers equipped with a flamethrower and PIAT. Although the attack was once again repulsed, the pillbox was successfully dealt with and the armored car forced to withdraw. Before any further attacks could be mounted, three German trucks loaded with infantry appeared on the bridge from the south in an effort to force their way across the bridge. Frost&#x27;s men had little problem in dealing with these trucks and took most of the occupants prisoner. As the evening continued, elements from the 1st Brigade Headquarters unit and a RASC platoon filtered into the bridgehead (building #4). C Company of the 3rd Battalion had also arrived, having to fight their way through the German blocking forces set up between Frost&#x27;s position and the rest of the 1st Division. Although weak at first, these German units now consisted of an effective continuous line.

By now, the patrols sent out to find B and C Companies had returned. C Company had been found but was discovered to be so completely surrounded that it could not be reached. B Company, although not located, eventually showed up at the bridge shortly before 0500 hours the next morning, minus one platoon.

Dawn of the 18th, the second day at the bridge, was accompanied by the sound of heavy vehicles approaching from the south. Expecting to see the lead elements of the British XXX Corps, Frost and his paratroopers were momentarily stunned to see armor units of a German SS reconnaissance battalion instead. This battalion of the 9th SS Panzer Division had crossed the road bridge at Arnhem one day earlier on its way to reconnoiter the road to the south from Arnhem to Nijmegen. The crossing was made only hours before the first units of Frost&#x27;s battalion arrived at the bridge. Finding the Nijmegen area to be temporarily secure from the Allied paratroops, the commander of the battalion, Captain Grabner led part of his column back to Arnhem to smash what he felt was a lightly held British bridgehead. A German column of 16 vehicles extended across the bridge. The paratroopers held their fire until the last moment and then all hell broke loose. At point blank range and from both sides of the bridge ramp, fire poured down on the hapless Germans from machine guns, PIATs, mortars and anti-tank guns. Grenades were lobbed at vehicles from rooftops and second story windows. Passengers were shot down by a murderous cross fire as they tried to escape from vehicles which caught fire. One halftrack was hit as it turned for the school on the east embankment and its crew gunned down as they dove for the surrounding brush. Unable to advance any further through the British gauntlet of fire the German survivors raced back to the southern end of the bridge. In less than two hours twelve German vehicles had been destroyed in what Frost was to term &quot;a lovely action&quot;.

By late afternoon the Germans were once again trying to infiltrate the British positions but this time from the east using elements of the 10th SS Reconnaissance Battalion. (It is at this point that our basic game begins.) This battalion had only recently been transferred to the control of the 9th SS Panzer Division. With the remainder of the 9th SS Reconnaissance Battalion somewhat blocked to the south of Arnhem by Frost&#x27;s battalion at the bridge, the unit was placed under the command of the 10th SS Panzer Division operating around Nijmegen. To compensate for this the 10th SS Reconnaissance Battalion was assigned to the 9th SS Panzer Division and given the primary task of eliminating the British bridgehead at Arnhem. To aid in its task the Bocholt Training and Depot Battalion was directed to assist them. In addition, a promise of a few Tiger Tanks from the 506th Heavy Tank Battalion, scheduled to arrive the next day, was also made.

With the arrival of the Bocholt Battalion, the intensity of fighting at the bridge markedly increased. Batteries of German artillery were called down on the British positions forcing the occupants, at times, into the cellars with the wounded. Attacks on Frost&#x27;s headquarters (building #3) had progressed to the point where some German assaults had to be driven off with bayonets. Still, the morale of the British defenders remained high. Even so, the battle was quickly turning into a contest of endurance, a contest that Frost knew his men could not win without help. Finally, after managing to contact Divisional HQ, Frost was informed that reinforcements had been sent to the bridge. To aid their arrival, he sent out patrols in an effort to open a path for them to the bridge. These patrols were eventually defeated and turned back by armored elements of the German blocking force.

By late afternoon the Germans had scarcely penetrated Frost&#x27;s perimeter despite their repeated assaults. With this in mind, Frost and Gough discussed a plan to send a mobile storming party across the bridge at last light. In the resulting surprise and confusion they hoped to open a passage to elements of the 1st Polish Parachute Brigade previously scheduled to drop south of the bridge. The plan was finally decided against for fear of a duplication of the German assault earlier that day.

The morning of the 19th brought renewed attacks from the east, many of which centered around the school (building #1) occupied by Captain Mackay&#x27;s engineers. Even after parts of the building were destroyed, the engineers were able to beat off each renewed attack with grenades and machine guns. Other strategic buildings were also being contested. Many would change hands several times throughout the course of the day as both sides fought with grim determination. If attempts at blasting the paratroopers out of their buildings didn&#x27;t work, the Germans would try routing the defenders by firing the building itself. The British responded by extinguishing the fires until the Germans cut off the water supply to the city. Still, the British managed to hold on until the very last moment before moving to another position.

At about 1530 hours a lone aircraft banked over the bridge and dove to the attack. Much to the annoyance of the British Red Devils, the plane turned out to be German. As the FW 190 approached from the south it dropped a bomb on the school with little effect, but as it banked to the left near the St. Walburgis Church (building #5) one wing hit the spire forcing the plane to crash into the small lake north of the road embankment to the robust cheers of the British onlookers. This emotional relief proved to be short lived. By 1930 hours the first Tiger Tanks had arrived at the bridge. Their target was once again the school occupied by Mackay&#x27;s engineers on the east embankment. Down to a fighting strength of less than two dozen men, the engineers still held onto the school in spite of continual blasting from the Tigers&#x27; 88mm guns.

Toward evening it became obvious that the Germans were successfully reducing and compressing the British defensive perimeter. Houses were in flames, buildings had collapsed, and positions were being overrun. Casualties were now so high that all available space for housing them was exhausted. The men had now been fighting, without letup, for over fifty hours and could hardly be expected to endure such punishment much longer. Yet, Frost was determined to deny the Germans the bridge to the end.

At first light of the 20th, the Germans once again resumed their determined bombardment of the buildings occupied by Frost and his men. Ammunition shortages were now making it increasingly more difficult to thwart the German attacks. The number of paratroopers still able to fight was somewhere around 150. Over 300 wounded crowded the cellars and basements of the rubble still held by the British. Shortly before noon Frost himself was wounded in both legs, requiring Major Gough to take over command.

Hand-to-hand fighting under the bridge pylons (building 7 &amp; 8) grew more intense as tank movements increased along the river from the east. This necessitated continual counterattacks in this area by remnants of A Company who sought to prevent the Germans from successfully setting demolition charges on the piers.

To the engineers defending in the school, the end seemed to be near. Almost completely cut off from the rest of the battalion and under renewed attacks every hour, Captain Mackay finally issued orders for the wounded and the 14 remaining men to evacuate the burning building. For them the fighting would soon be over.

Late that afternoon the first German tanks since Sunday were finally able to cross the bridge from north to south. The British anti-tank guns which had prevented this movement earlier were now under continuous German fire making them impossible to man.

By now, Frost&#x27;s headquarters building (building #3) was burning out of control and the lives of the wounded sheltered there, were in extreme jeopardy. There was nowhere remaining where the wounded could be safely evacuated so Frost regrettably surrendered to the Germans. The men still capable of fighting were not to surrender, however. They were to move to other buildings and continue the fighting from there. With that, the Red Cross flag was hung out and the wounded removed. During the truce the Germans were able to infiltrate a large number of men into positions which they had been previously unable to reach. Once the last of the wounded were out of the way, the shooting started once again.

An attempt was made at this time, under Gough&#x27;s command to break out toward the west in small parties in hopes of linking up with the rest of the 1st Division. But the move was spotted before they had covered fifty yards. Many were wounded or killed. Even so, the remaining paratroopers fought on throughout the night amidst the rubble, outnumbered, surrounded, and with little ammunition.

The morning of the 21st saw the last German operation to clear out the paratroopers from the remaining buildings. By 0900 the area surrounding the bridge had been completely cleared of British troops. It would be hours though before the wreckage on the bridge could be cleared and normal vehicular movement across the bridge resumed. During the final hours, one last message was radioed from somewhere near the bridge. Although not received by British headquarters, it was picked up by the 9th SS Divisional headquarters. The garbled transmission ended with the words: &quot;Out of ammunition. God Save the King&quot;.

It had originally been estimated that the 1st Airborne Division would have to hold the bridge for only 24 hours. By that time contact with relief elements from the XXX Corps, advancing from the south was expected. For three days and four nights, against increasingly hopeless odds and without help or reinforcements one battalion had survived a task assigned to an entire division. Although Market-Garden proved to be a costly Allied defeat, the performance of the British paratroopers at Arnhem proved to be the most gallant and determined action of British arms in the war.